The Order of Trades in a Kitchen Remodel

A kitchen remodel in Bellevue, WA is mostly a question of order. Almost every delay on a job traces back to one trade arriving before the one it depends on has finished, or to a decision made after the material was already cut. Knowing the sequence, and why each step sits where it does, lets a homeowner read a schedule and spot trouble before it costs a week.
Why does the order of trades matter so much?
Each trade works on top of the last. The electrician cannot place boxes until the framing is settled, the drywall crew cannot close the walls until the inspector has seen the wires and pipes, and the tile setter cannot start until the cabinets and the counters have fixed the heights. Undo any link in that chain and the work in front of it gets torn out or patched.
On the Eastside the chain has an extra constraint: the weather. Houses in Crossroads, Factoria and the hillsides toward Cougar Mountain lose a lot of daylight from November through February, and rain turns every delivery into a wet one. Materials that cannot get wet, such as cabinet boxes and flooring, need a dry place inside the house, which takes floor space and is part of the plan from the first day.
What does the sequence look like from start to finish?
The table below lays out a typical full gut remodel. Smaller jobs skip some rows, but the relative order of the rows that remain does not change.
| Stage | What happens | What must be finished first |
|---|---|---|
| Measure and layout | Final dimensions, appliance specs, island and walkway tape on the floor | Nothing, this is the start |
| Permit | Plans reviewed by the city or King County, depending on the address | A drawn layout with the circuits and duct runs shown |
| Demolition | Cabinets, counters, flooring and any wall that is coming out | Permit in hand, kitchen emptied, dust barriers up |
| Framing and structure | Moved walls, new openings, blocking for the cabinets | Demolition complete, any hidden damage found |
| Plumbing and electrical rough in | Supply lines, drains, the hood duct, new circuits, boxes and cable | Framing done, layout fixed |
| Rough inspection | Inspector looks at the open walls | All rough work finished and visible |
| Insulation and drywall | Walls closed, taped, sanded and primed | Rough inspection passed |
| Flooring | Underlayment and the finished floor, or just the underlayment if the floor goes in later | Drywall dust finished |
| Cabinets | Boxes leveled, set and screwed to the blocking | Walls painted or primed, floor protected |
| Template and counters | Templates taken after the cabinets are set, then the tops fabricated and installed | All cabinets fixed in place |
| Backsplash | Tile set and grouted above the counters | Counters installed |
| Finish plumbing and electrical | Sink, faucet, appliances, fixtures, switches and plates | Counters and backsplash done |
| Final inspection and punch list | Last inspection, touch up, adjustments | Everything above |
Why can the counters not be ordered at the start?
Stone and quartz are cut to a template taken after the cabinets are set, because cabinet boxes are never exactly where the drawing says. A wall that is a quarter inch out of plumb shifts a run enough that a pre cut top will not sit flat. Waiting for the template adds a gap in the schedule where the kitchen has cabinets and no counter, which looks like a stall but is the normal and safe order. Fabricators usually need some days between the template and the install, so that week is better planned than discovered.
The same logic applies to the sink and the cooktop. The cutouts are made from the appliance in hand, not the brochure, so the model must be chosen and on site before the template visit.
Where does lighting fit into the order?
Lighting is decided early and installed in two parts. The rough in part, the cable runs and the boxes for cans and pendants, happens before the walls close, which means the fixture locations must be settled at the layout stage. The finish part, the trim rings, lamps, strips and dimmers, goes in at the end.
That split matters in a Bellevue winter. A kitchen that is dark at three in the afternoon reveals every missing fixture the first week the owners live in it, and adding a can after the drywall is painted costs a patch, a repaint and a day. Walking the layout with a work light on a gray afternoon, before the walls close, is the cheapest way to find the dim corners. Under cabinet strips need a hidden cable path to the switch, so the cabinet layout and the lighting plan are one decision.
What about the floor, before or after the cabinets?
This is the argument that never fully settles, and the honest answer is that it depends on the floor and on the owner's plans. Running tile or hardwood under the cabinets means a future kitchen change leaves a pattern of old scars in the floor, and it uses material that nobody will see. Stopping the floor at the cabinet edge saves material and lets the cabinets sit on a clean, level subfloor, but it leaves exposed edges that need toe kick trim and careful scribing.
A floating vinyl plank floor is nearly always installed after the cabinets, because the planks need room to move at the edges and cabinets pinned on top of them would restrict that. Engineered hardwood nailed to the subfloor is often laid first so that a continuous surface runs into the neighboring room. Whichever way it goes, the other trades protect the finished surface with heavy paper or hardboard, and the protection should be checked weekly, since a dropped tool through the paper marks the floor.
How do inspections change the calendar?
Inspections are scheduled events with a window, not a promise of a precise hour, and the crew cannot close the walls until the inspector signs the rough work. A failed inspection, even for a minor item like a missing nail plate or an unsecured cable, pushes the schedule by the time it takes to fix and re book. The way to avoid it is to review the work before the inspector arrives, from the panel to the last box.
The final inspection comes after the fixtures are on. The inspector checks the ground fault protection, the smoke and carbon monoxide devices, the hood duct termination and, where gas is involved, the connection and shutoff. Keep the appliance manuals on the counter that day, because the inspector may need a model number.
What commonly goes wrong with lead times?
Three things stretch a schedule more than anything else. Cabinets are often built to order and can take weeks to arrive, so a delivery date is confirmed before demolition, not after. Special order tile and appliances can be backordered, and one missing appliance holds up the template, the finish plumbing and the final inspection together. And a change to the layout after the rough in is the costliest change of all, because it reopens walls that have been inspected.
A practical habit is to receive and inspect every box before the work that needs it begins. A cabinet door with a chipped corner found in the garage is a phone call. The same door found after the install is a rebuilt run.
How should living in the house be handled?
A temporary kitchen, a table with a microwave, a kettle and a bin of dishes, works for a few weeks if it sits away from the dust. Dust barriers, a zipper door and a running negative air fan keep the drywall sanding mostly in the work zone, though a thin film still reaches the rooms nearby. Plan on the water being shut off for stretches at the rough in and the finish plumbing stages, and fill containers beforehand.
Neighbors on streets near Lake Sammamish or Mercer Slough often share narrow driveways, so deliveries and the dumpster are coordinated with them in advance. The work hours are set by the city, and a noisy demolition is scheduled inside them.
What is the simplest way to keep the order honest?
Write the stages on a single page, put a date beside each, and mark which ones wait on another. When a date slips, move every dependent date at once and look at what lands in the next rainy week. The point of the list is to keep the sequence visible, and the job runs best when the person in the house can read it as well as the crew.